- Rev TTM
- $20.07B
- YoY
- +18.5%
- Gross m.
- —
- Op. margin
- -1.4%
- FCF
- −$485M
- Net cash
- —
- P/S
- 0.4×
- Disclosed relationships
- 1
18 links, and every one of them yields a list
Break AI into minerals, industrial gases, chipmaking equipment, power, racks, networking, models and applications. Reading along the chain separates supply constraints, customer ties and valuation exposure. Downstream businesses still depend on upstream equipment and energy.
Scroll down and the figure highlights as you go. You can also click any link in the figure to jump there.
Scroll down and the colour bar at the top follows you. Each link opens with its own composition bar, and a full-chain table sits at the end.
- Market cap and revenue use different bases. In accelerator design, market-cap weight and the selected revenue proxy differ by about 3.1×; the gap is not evidence of mispricing.
- Multi-link companies are counted at full market cap in each link. This cannot allocate business value or bound industry concentration.
- Unlisted does not mean no indirect exposure. OpenAI and Anthropic have no standalone listed shares; listed investors and suppliers have different risks and returns.
The next three sections take these apart one by one. In a hurry for the chain itself? Click the figure.
Bar length is market cap, not shipments
Node size = company market cap ÷ sum of market caps of all nodes in its link (a market-cap proxy, not market share).
Market cap reflects company valuation; revenue reflects specific activities and periods. Accelerator design illustrates the difference:
| Reading | Value | What it actually says |
|---|---|---|
| NVDA share on this page | 24.9%computed | NVIDIA market cap ÷ sum of the 11 companies in this link |
| NVDA share of the five vendors’ market caps | 66.1%computed | NVIDIA market cap ÷ combined market cap of the five accelerator vendors (NVDA / AMD / AVGO / MRVL / CBRS), the same set as the revenue share. Computed on this page |
| Selected-vendor revenue proxy | 77.6%A | Selected lines: NVIDIA Data Center, AMD Data Center segment, Broadcom AI semiconductors, Marvell data center and Cerebras. Broadcom contributes $16.7B of AI semiconductor revenue for FQ3 ended August 2, 2026, not total company revenue; the other companies also use their own fiscal periods. Data-center scopes mix compute and networking, not pure accelerators. The prior-year proxy was 82.8% with only four names because Marvell did not break out data centers; the change is not solely a competitive-share shift. |
| Gap | ≈ 1.2× for the same five companies; ≈ 3.1× against the full-link sample | Selected revenue proxy divided by market-cap weight illustrates different statistical bases. Even with the same companies, business scopes, dates and metrics differ. The ratio is not evidence of distorted market caps, overvaluation or undervaluation. |
Bars describe how sample market cap is distributed. The revenue proxy mixes business scopes and fiscal periods; it is not pure accelerator shipment share and cannot establish overvaluation or undervaluation against market-cap weights.
14 multi-link companies counted at full value in each link
Multi-link entities enter each link at full market cap. Link weights use the de-duplicated chain total, so the 18 weights can sum to more than 100%. These sample valuation weights are neither business shares nor bounds on industry concentration.
Microsoft has seats in custom accelerators, cloud and applications. Filings provide no separately traded market cap for these activities. This map makes no segment valuation; it retains full company value and marks repeated inclusion. The red hatching in the figure is the companies below.The table below lists them all.
| Entity | Links | Market cap | Which links (and share within each) |
|---|---|---|---|
| GOOGL AlphabetMega cap | 3 | $3.916T | Accelerator Design 19.1% / Cloud & Compute 29.4% / Models 50.0% |
| MSFT MicrosoftMega cap | 3 | $3.895T | Accelerator Design 19.0% / Cloud & Compute 29.2% / Applications & Data 72.6% |
| INTC IntelMega cap | 3 | $451.8B | Accelerator Design 2.2% / Advanced Foundry 16.7% / Advanced Packaging 16.6% |
| NVDA NVIDIAMega cap | 2 | $5.084T | Accelerator Design 24.9% / Networking & Optics 63.0% |
| AMZN AmazonMega cap | 2 | $2.675T | Accelerator Design 13.1% / Cloud & Compute 20.1% |
| TSM TSMCMega cap | 2 | $2.171T | Advanced Foundry 80.0% / Advanced Packaging 79.8% |
| SPCX SpaceXMega cap | 2 | $2.003T | Cloud & Compute 15.0% / Models 25.6% |
| META MetaMega cap | 2 | $1.643T | Accelerator Design 8.0% / Models 21.0% |
| AVGO BroadcomMega cap | 2 | $1.536T | Accelerator Design 7.5% / Networking & Optics 19.0% |
| GEV GE VernovaMega cap | 2 | $217.1B | Grid & Electrical 39.3% / Generation & On-site Power 21.2% |
| MRVL MarvellMega cap | 2 | $200.4B | Accelerator Design 1.0% / Networking & Optics 2.5% |
| ETN EatonMega cap | 2 | $142.2B | DC Power & Cooling 20.0% / Grid & Electrical 25.8% |
| HUBB Large cap | 2 | $23.67B | DC Power & Cooling 3.3% / Grid & Electrical 4.3% |
| POWL PowellMid cap | 2 | $5.499B | DC Power & Cooling 0.8% / Grid & Electrical 1.0% |
Links with high multi-link market-cap weights: Advanced Foundry 96.6% · Models 96.6% · Advanced Packaging 96.5% · Accelerator Design 94.8% · Cloud & Compute 93.8% · Networking & Optics 84.5% · Applications & Data 72.6% · Grid & Electrical 70.4%. This indicates mixed business exposure; it does not quantify market-share bias or establish upper or lower bounds.
Unlisted model companies in the network
Ranked by each entity’s connections among 907 disclosed relationships, including signed agreements and existing business ties reported in filings. Listing status and link inclusion are separate dimensions. Counts depend on this map’s coverage, not total contract value, revenue or industry standing.
Anthropic ranks 2 and OpenAI 8. Their compute purchases, financing and infrastructure ties make them important buyers in this sample; relationship counts do not establish their share of industry demand.
- Without standalone listed shares, listed investors, suppliers and creditors can offer indirect exposure, with economics and risks distinct from owning the model companies.
- The whole map has 184 genuinely unlisted counterparties, 160 entities that are listed but outside this chain (WMT, AEP, Barclays), and 166 anonymous counterparties (appearing in filings as “a customer”). Do not read the three as one group.
- Anonymous counterparties are recorded separately for each discloser; identities may overlap or differ. Node counts cannot establish customer concentration without comparable transaction values and a complete denominator.
- CR3 here is the combined weight of the three largest market caps in the selected sample. Other ratios, such as customer revenue shares, retain their explicitly stated source basis.
Copper connects equipment and power; this link has 1.86% of sample market cap not covered by the source notes
By weight, base metals sit near the top of a data center bill of materials: copper busbars, transformer windings, rack structural steel, cooling piping. What this link sells is mining and smelting capacity. Pricing follows long-term contracts and spot, two or three processing steps removed from AI demand.
This link is an origin on this map; nothing feeds into it.
Copper, rare earths, aluminum and steel feed racks, busbars, transformers and magnets. This is a US-listed mining and refining sample; market-cap weight is neither material volume nor a measure of AI’s impact on commodity prices.
- Rev TTM
- $305.4M
- YoY
- +89.0%
- Gross m.
- —
- Op. margin
- -41.5%
- FCF
- −$504.6M
- Net cash
- —
- P/S
- 22.3×
- Disclosed relationships
- 7
Entities directly connected to companies in this link but not on the 18-link list. Some are genuinely unlisted (OpenAI, Anthropic); others are listed but outside this chain. Dotted boxes are anonymous counterparties that appear in filings as "a customer". The number is how many relationships connect to this link.
Show 26 more entities
- 10 listed entities, CR3 65.7%. BHP, Southern Copper and Rio Tinto take most of the weight; MP Materials, the rare earth name, holds only 1.0%. computed
- A rise in metal prices does not reach the data center directly. Copper and grain-oriented electrical steel enter transformer makers' costs first, then feed through quoting cycles into equipment lead times. That stretch is covered in link 10. C
- Miners' October 2026 updates show diverging supply trends. BHP produced 400,700 tonnes of copper in the quarter ended September, down 19% year on year, while maintaining its full-year guidance. Rio Tinto's third-quarter copper production was 205,000 tonnes, broadly unchanged year on year. In its 2026-10-02 update, FCX targeted restoration of about 80% of Grasberg's capacity by mid-2027 and a return to near-full capacity by year-end. Mine output cannot be mapped directly to data-center demand. B
Sources · 3
- C 2 Wood Mackenzie 2026 lead-time figures via powermag / terrapincg / build.inc open source ↗
- B 3 Facts and company outlooks from the originals; dates, periods and conditions are retained in the text. Causal interpretation and verification methods are this map’s analysis. Official disclosure · 2026-10-02 ↗ Official disclosure · 2026-10-20 ↗ Official disclosure · 2026-10-14 ↗
- B One-line verdict BHP August 2026 Economic and Commodity Outlook: AI and data-center copper demand. Market-cap weight is computed here and does not attribute copper-price changes. open source ↗
- Annually compare miners’ disclosed data-center copper demand, its share of total demand and new output. BHP’s August 2026 outlook already discusses AI-driven copper demand. Track whether quantified demand materializes rather than treating the first mention of AI as a future trigger.
- Track production, maintenance and restart milestones by mine, alongside inventories and copper prices. Teck received a strike notice for Highland Valley Copper on 2026-10-21; industrial action could begin no earlier than 2026-10-24. As of this review, a shutdown has not been established. Supply recovery at a single project does not demonstrate a shorter development cycle across the industry. B
Sources · 1
- B Watch · how to know this is wrong 2 Facts and company outlooks from the originals; dates, periods and conditions are retained in the text. Causal interpretation and verification methods are this map’s analysis. Official disclosure · 2026-10-21 ↗
Inclusion and other relevant entities
Inclusion: Inclusion: US-listed miners and smelters of copper, aluminium, steel or rare earths, ranked by market cap; no AI-linked filed contract required. Sampled layer.
Other relevant entities (outside this link’s bars): Codelco (state-owned), Glencore · LSE, Anglo American · LSE, Chalco · HK/SSE, China Northern Rare Earth · SSE
The weight stops midstream: pipelines and LNG terminals hold 79.5%, gas producers only 13.0% computed
Generation needs fuel first. This link is the intake for the generation side: gas pipelines, LNG terminals, gas fields, plus three uranium mining and nuclear fuel names. It produces no electricity itself, yet it determines whether newly installed gas turbines can run at full load for years.
This link is an origin on this map; nothing feeds into it.
Gas production, pipelines, LNG terminals, uranium mining and nuclear-fuel processing sit upstream of generation. Fuel risk depends on location, transport and processing capacity, not commodity quotes alone. Generation equipment and operators are in link 11.
- Rev TTM
- $37.25M
- YoY
- —
- Gross m.
- 45.4%
- Op. margin
- -357.4%
- FCF
- −$107.3M
- Net cash
- —
- P/S
- 97.8×
- Disclosed relationships
- 2
Entities directly connected to companies in this link but not on the 18-link list. Some are genuinely unlisted (OpenAI, Anthropic); others are listed but outside this chain. Dotted boxes are anonymous counterparties that appear in filings as "a customer". The number is how many relationships connect to this link.
Show 24 more entities
- 12 entities worth $528.9B combined, No. 14 of the 18 links by market cap and 1.41% of the chain. computed
- Six pipeline and LNG terminal names, Williams, Kinder Morgan, Cheniere, ONEOK, Energy Transfer and Targa, hold 79.5% together; the three producers, EQT, Antero and Expand Energy, hold 13.0%. computed
- The three uranium and nuclear fuel companies together account for 7.5%. In natural gas, Kinder Morgan announced a final investment decision on 2026-10-21 for the 2.8 billion cubic feet per day Permian Link project, targeting service in the third quarter of 2030, subject to permits. On 2026-10-22, Cheniere disclosed long-term LNG agreements with QatarEnergy totaling approximately 4 million tonnes per year, of which approximately 1 million tonnes per year is conditional on a final investment decision for the relevant expansion. Announced capacity must be distinguished from fuel already being delivered. B
Sources · 2
- B 3 Facts and company outlooks from the originals; dates, periods and conditions are retained in the text. Causal interpretation and verification methods are this map’s analysis. Official disclosure · 2026-10-21 ↗ Official disclosure · 2026-10-22 ↗
- C One-line verdict Research interpretation or verification method, not company guidance.
- Monthly, read US dry gas production in the EIA Natural Gas Monthly alongside the Henry Hub spot price. Production turning negative year over year while Henry Hub spot rises for two consecutive quarters would make fuel itself a binding constraint, and this chapter's judgment fails.
- Annually, take the share of capacity under take-or-pay contracts and the weighted average remaining term from the Cheniere and Williams 10-Ks. Either measure falling for two consecutive years erodes the contractual base under the 79.5% of weight sitting in midstream.
Inclusion and other relevant entities
Inclusion: Includes a US-listed sample of gas production, pipelines/LNG, uranium and nuclear fuel; not all smaller producers or MLPs.
Other relevant entities (outside this link’s bars): Urenco (unlisted), Orano (French state-owned), Kazatomprom · LSE/AIX
Linde holds 49.6% of sample market cap; continuous gas supply matters to wafer production not covered by the source notes
Industrial gases support wafer fabrication, etching and cleaning, often through long-term on-site supply arrangements. Interruptions can cause downtime, yield loss or scrapped work in process; the outcome depends on the process, backup supply and duration.
This link is an origin on this map; nothing feeds into it.
This link includes industrial gases, specialty chemicals and materials. Linde and Air Products are the industrial-gas names in this sample. Qualification and supply reliability affect switching costs; interruption risk alone does not establish pricing power.
- Rev TTM
- $9.712B
- YoY
- +8.7%
- Gross m.
- 20.9%
- Op. margin
- -7.1%
- FCF
- $708M
- Net cash
- −$10.64B
- P/S
- 0.5×
- Disclosed relationships
- 2
- Rev TTM
- $3.634B
- YoY
- +6.4%
- Gross m.
- 22.7%
- Op. margin
- 13.6%
- FCF
- $281M
- Net cash
- —
- P/S
- 1.0×
- Disclosed relationships
- 3
- Rev TTM
- $1.842B
- YoY
- +7.3%
- Gross m.
- 31.5%
- Op. margin
- 7.4%
- FCF
- $250M
- Net cash
- —
- P/S
- 1.8×
- Disclosed relationships
- 3
Entities directly connected to companies in this link but not on the 18-link list. Some are genuinely unlisted (OpenAI, Anthropic); others are listed but outside this chain. Dotted boxes are anonymous counterparties that appear in filings as "a customer". The number is how many relationships connect to this link.
Show 5 more entities
- 10 entities, CR3 81.1%. Only two of them, Linde and Air Products, are true industrial gas suppliers. computed
- Following DuPont's completion of the Qnity spin-off in November 2025, CMP materials, photoresists, cleaning and etching materials, and advanced packaging and interconnect materials belong to the independently listed Qnity (Q); they can no longer all be attributed to DD. This edition adds Q. DD remains in the sample for its retained industrial and water-treatment materials businesses, rather than as a proxy for its former electronics materials business. B
- Industrial gas companies do not derive all their growth from semiconductors. On 2026-10-21, Linde announced that it had acquired and was operating two air separation units at Tata Steel, bringing its total oxygen capacity in the Kalinganagar region to more than 7,000 tonnes per day. On 2026-10-07, Air Products disclosed an air separation project in Malaysia using LNG cold energy, targeting startup in early 2027. Orders across industries show why capacity and capital expenditure must be assessed by end use, rather than attributed entirely to AI. B
Sources · 3
- B 2 Facts and company outlooks from the originals; dates, periods and conditions are retained in the text. Causal interpretation and verification methods are this map’s analysis. Official disclosure · 2025-11-03 ↗ Official disclosure · 2026-02-26 ↗
- B 3 Facts and company outlooks from the originals; dates, periods and conditions are retained in the text. Causal interpretation and verification methods are this map’s analysis. Official disclosure · 2026-10-21 ↗ Official disclosure · 2026-10-07 ↗
- C One-line verdict This map's own inference from publicly known industry structure; no independent primary source [C]
- Review the on-site long-term supply revenue share, contract duration, price adjustment and cost pass-through terms actually disclosed in Linde and Air Products annual reports. Cross-check them against realized price changes and gross margins. Retain unknowns where disclosure is insufficient; a change in duration or revenue share alone does not establish stronger or weaker pricing power.
- Quarterly, track the semiconductor portion of Air Products' project backlog. The backlog turning down while leading-edge logic and advanced packaging are still adding capacity would show that gas supply no longer tracks fab expansion, and this chapter's judgment fails.
Inclusion and other relevant entities
Inclusion: A US-listed sample of gases, specialty chemicals and materials; this edition does not cover all consumables such as wafers and photoresists.
Other relevant entities (outside this link’s bars): Shin-Etsu / SUMCO · TSE; JSR (delisted 2024-06-25); Air Liquide · Euronext; Merck KGaA · XETRA
Arm holds 55.6% of sample market cap; EDA and IP depend on R&D, licensing and compliance computed
EDA provides chip-design and verification tools; IP supplies reusable circuit blocks. These businesses depend less directly on new wafer fabs, but talent, verification, software and hardware delivery, licensing and export restrictions can still constrain growth.
This link is an origin on this map; nothing feeds into it.
EDA and IP growth depends on R&D, verification, licensing and export compliance. Direct dependence on new wafer fabs is lower, but supply is not unlimited. CR3 measures the sample’s market-cap mix, not EDA or IP business share.
- Rev TTM
- $756.3M
- YoY
- +20.4%
- Gross m.
- 79.5%
- Op. margin
- 35.5%
- FCF
- $299.5M
- Net cash
- —
- P/S
- 12.3×
- Disclosed relationships
- 5
Entities directly connected to companies in this link but not on the 18-link list. Some are genuinely unlisted (OpenAI, Anthropic); others are listed but outside this chain. Dotted boxes are anonymous counterparties that appear in filings as "a customer". The number is how many relationships connect to this link.
- The sample contains 4 companies, with a CR3 of 97.7%: Arm accounts for 55.6%, Cadence and Synopsys together for 42.1%, and Rambus for 2.3%. These are weights based on each company’s entire market capitalization within this link’s sample, not EDA or IP market shares. C
- This link files quarterly, so the figures can be checked quarter by quarter. Further down, within a single year, disclosure granularity fell in the same direction across semiconductor equipment (ASML stopped reporting quarterly net bookings; Onto stopped breaking out dollar amounts), optical interconnect (Lumentum collapsed into a single reportable segment) and the data-center physical layer (Vertiv stopped reporting quarterly orders). TSMC, asked to break out advanced-packaging capex as a separate line, explicitly declined: granularity held rather than fell. A
- The limits are written into export controls and license terms, not into production lines. A license can be revoked; a fab does not vanish. C
Sources · 4
- C 1 Research interpretation or verification method, not company guidance.
- A 2 TSM 20-F 0001628280-26-025362 (FY2025, filed 2026-04-16) Note 38 single operating segment, revenue split only Wafer/Others; ASML 6-K 0001628280-26-048235 (CY2026Q2 results-release exhibit, filing date not recorded) stopped reporting quarterly net bookings from 2026Q1; LITE 10-K 0001628280-26-057358 (FY ended 2026-06-27, filed 2026-08-17) Note 17 reorganized into a single reportable segment from FY2026 Q1; the first sentence “files quarterly” is this map’s own inference [C] open source ↗
- C 3 This map's own reading of the v3 chokepoint tier table; no independent primary source [C]
- C One-line verdict This map's own reading of the v3 chokepoint tier table; no independent primary source [C]
- Quarterly, split royalty revenue from licensing revenue in Arm's 10-Q. Licensing falling year over year for two consecutive quarters while royalties keep growing would show the constraint has landed on the licence side, confirming this chapter's judgment.
- On an event basis, watch BIS Entity List additions and export control amendments in the Federal Register. EDA tools being brought back under a China licence requirement would confirm that the risk sits on the licence list; controls easing while the three names' China revenue recovers would falsify it.
Inclusion and other relevant entities
Inclusion: Inclusion: US-listed EDA tool vendors and processor / interface IP licensors.
Other relevant entities (outside this link’s bars): Siemens EDA (Siemens business; parent listed on XETRA)
This link is 54.45% of chain market cap, and on the accelerator-vendor basis, selected-vendor revenue proxy has slipped about 5 percentage points in a year (2025Q2 to 2026Q2), roughly 1.5 points of that from a wider denominator A
Accelerators are the chips built to do matrix multiplication and little else. Whoever's silicon gets written into the training script takes the largest gross-profit pool in the chain. This link also has a structure found nowhere else: several of its largest customers are themselves listed inside it.
NVIDIA is about 77.6% of the selected-vendor revenue proxy for the fiscal periods mapped to 2026Q2, versus 82.8% for 2025Q2, when Marvell did not disclose data-center revenue and only four names were included. Excluding Marvell gives about 79.1% currently. Business scopes and fiscal dates differ; this is not pure accelerator industry share or evidence of distorted market caps.
No mid-cap watchlist names in this link. Large/mega and small/micro caps remain in their respective groups. The all-seats basis describes sample valuation weights.
Entities directly connected to companies in this link but not on the 18-link list. Some are genuinely unlisted (OpenAI, Anthropic); others are listed but outside this chain. Dotted boxes are anonymous counterparties that appear in filings as "a customer". The number is how many relationships connect to this link.
Show 40 more entities
- 11 entities worth $20.46T combined, 54.45% of the chain, No. 1 of the 18 links by market cap; CR3 63.0%. computed
- On accelerator-vendor filed revenue (NVIDIA Data Center + AMD Data Center segment + Broadcom AI semiconductor + Marvell data center + Cerebras): NVIDIA's share was 77.6% in the second quarter of 2026, against 82.8% in the second quarter of 2025. The Broadcom cell for the second quarter of 2026 now carries the FQ3 actual of $16.7 billion, replacing the earlier $16.0 billion guidance, 14.6% of the denominator, evidence grade A. The two denominators are not the same: in the second quarter of 2025 Marvell had not yet broken out data-center revenue, so the denominator had four names; excluding Marvell from the second quarter of 2026 as well gives 79.1%, a like-for-like drop of about 3.7 percentage points, with the remaining roughly 1.5 points coming from the wider denominator. A
- The loosening shows up in contracts first: as of 2026-05-03, Broadcom's remaining performance obligations went from $45.0 billion to $164.6 billion in a single quarter, including one long-dated custom accelerator contract the customer has no right to terminate; by 2026-08-02 the balance had risen again, to $179.2 billion. A
- That share excludes Google's and Amazon's in-house silicon, which never enters the denominator of the filed figures. On 2026-09-03, though, Qualcomm issued a warrant to an Amazon affiliate for up to 25 million shares at $161.26, vesting in tranches against signed commercial arrangements, binding purchase orders and actual purchases, with cumulative payments capped at $60 billion. Server-chip purchases that move to a listed vendor land in filed revenue once they happen, so this is one way the denominator of this chapter widens later; the 8-K says only “server chip products, technology, systems and manufacturing services” and does not say how much of that is accelerators. The $126.6 billion supply-side hardware net figure is a separate basis spanning drives, switching and power, and this chapter does not use it as a share denominator. B
Sources · 4
- A 2 NVDA 8-K CFO commentary data-center revenue by quarter [A]; AMD earnings release segment table [A]; AVGO 8-K 0001730168-26-000076 Ex-99.1, FQ3 2026 actual (2026-09-02) [A]; MRVL 10-Q end-market split [A]; CBRS 10-Q [A]; share computed on this page
- A 3 AVGO 10-Q 0001730168-26-000054 (2026-05-03, filed 2026-06-09): “contracts where customers do not have termination rights”; prior-quarter RPO $45.0bn; 2026-09-23 update: AVGO 10-Q 0001730168-26-000080 (FQ3 2026, period ended 2026-08-02, filed 2026-09-10), “Remaining Performance Obligations”: RPO under multi-year firmly committed contracts, “including contracts where customers do not have termination rights,” approximately $179.2 billion as of August 2, 2026; the filing states these commitments include the long-term custom AI accelerator contract entered in the fiscal quarter ended May 3, 2026 open source ↗
- B 4 As above; the $126.6bn supply-side net figure is a cross-link basis (including weighted STX / WDC / ANET / VRT revenue), computed on this page
- C One-line verdict Research interpretation or verification method, not company guidance.
- The baseline is Broadcom’s company-wide RPO of $179.2 billion at 2026-08-02, of which approximately 25% was expected to be recognized over the next 12 months. Multiplying the two gives approximately $44.8 billion. This is expected recognition from existing contracts, not guidance for total future revenue. A decline in the balance or percentage may also reflect fulfillment, contract duration or the mix of new orders. Assess delays only after checking new contracts, cancellations and actual revenue recognition. C
- Quarterly, recompute NVIDIA's data-center share on the same five-vendor filed basis as point 2: 77.6% in the second quarter of 2026, using the FQ3 actual of $16.7 billion Broadcom published on 2026-09-02 in place of the earlier $16.0 billion guidance, against 82.8% in the second quarter of 2025, a drop of 5.2 percentage points over four quarters. The next recompute waits for Broadcom's FQ4 report to replace the $21.7 billion AI-semiconductor guidance with an actual. If the share is back above 82.8% for two consecutive quarters, that is back at its starting level a year earlier, this chapter's reading that share is falling fails; if it sheds another 5.2 points within the next two quarters and drops below 72.4%, erosion has reached revenue rather than sitting in contracts, and this chapter's sequencing judgment that change is booked into remaining performance obligations first and reaches revenue later fails.
Sources · 1
- C Watch · how to know this is wrong 1 Research interpretation or verification method, not company guidance.
Inclusion and other relevant entities
Inclusion: Includes recorded data-center AI accelerator designers, including captive TPU, Trainium, Maia and MTIA. This is sample coverage, not a ruling that every absent company lacks qualifying products or R&D.
Other relevant entities (outside this link’s bars): Huawei Ascend (unlisted), Cambricon · SSE
TSMC holds 80.0%, and the top of 2026 capex guidance runs more than 50% above 2025 actuals B
A finished layout has to be printed onto silicon, and the capacity to print the most advanced layers is highly concentrated. TSMC raised its 2026 capex guidance in July. The money goes in on the company's own schedule, but the tightest step is not this one.
TSMC’s July 2026 company guidance puts annual capex at $60–64B. Spending, installation, yield and deliverable capacity are distinct stages. Being untiered in this map does not guarantee that capacity arrives on plan.
No mid-cap watchlist names in this link. Large/mega and small/micro caps remain in their respective groups. The all-seats basis describes sample valuation weights.
Entities directly connected to companies in this link but not on the 18-link list. Some are genuinely unlisted (OpenAI, Anthropic); others are listed but outside this chain. Dotted boxes are anonymous counterparties that appear in filings as "a customer". The number is how many relationships connect to this link.
- On 2026-10-15, TSMC reiterated its 2026 capital-expenditure guidance of $60 billion to $64 billion, maintaining the range raised in July, and acknowledged tight equipment supply. Third-quarter revenue was NT$1.494 trillion, with a gross margin of 66.4%; 2nm and 3nm accounted for 8% and 33% of wafer revenue, respectively. Capital budgets, board-approved appropriations and actual cash expenditure are distinct measures. B
- Advanced packaging is not disclosed separately: wafer revenue was 86% of net revenue in 2025, while the residual other line grew 41.2% year over year, ahead of wafer at 30.1%. A
- CR3 for this link is 98.4%. Intel Foundry, UMC, GlobalFoundries and Tower hold 20.0% between them. computed
Sources · 3
- B 1 Facts and company outlooks from the originals; dates, periods and conditions are retained in the text. Causal interpretation and verification methods are this map’s analysis. TSMC 3Q26 earnings conference transcript hosted on company IR · 2026-10-15 ↗ TSMC 3Q26 earnings release, 6-K exhibit 99.1 · 2026-10-15 ↗
- A 2 TSM 20-F 0001628280-26-025362 (FY2025, filed 2026-04-16): Item 5 Operating and Financial Review 'wafer fabrication, which accounted for approximately 86% of our net revenue in 2025. The rest … packaging and testing services, mask making, design, and royalty income'; financial-statement note 'NET REVENUE — Disaggregation of Revenue from Contracts with Customers by Product', XBRL R122.htm (Wafer 2024 NT$2,514,461.3m → 2025 NT$3,272,553.5m, +30.1%; Others NT$379,846.4m → NT$536,500.8m, +41.2%); Note 38 single operating segment (R166.htm) [A]. Source-note locations open source ↗
- C One-line verdict Research interpretation or verification method, not company guidance.
- Track the project milestones disclosed in October: annual capacity for the N2 family is expected to more than double in 2027; volume production at the second Arizona fab is targeted for the third quarter of 2027; and the additional Tainan 3nm fab is targeted for the first half of 2028. These are company forecasts. Check actual installation, qualification and volume-production progress for each project. B
- Compare capital-expenditure guidance with final cash spending, equipment arrivals and capacity utilization. A budget reduction need not indicate weaker demand; delivery schedules, costs or project timing may also explain it. Board-approved appropriations must not be added to cash capital expenditure for the current period. C
Sources · 2
- B Watch · how to know this is wrong 1 Facts and company outlooks from the originals; dates, periods and conditions are retained in the text. Causal interpretation and verification methods are this map’s analysis. TSMC 3Q26 earnings conference transcript hosted on company IR · 2026-10-15 ↗
- C Watch · how to know this is wrong 2 Research interpretation or verification method, not company guidance.
Inclusion and other relevant entities
Inclusion: Inclusion: US-listed (including ADR) logic foundries. Samsung Foundry and SMIC are not US-listed.
Other relevant entities (outside this link’s bars): Samsung Foundry (Samsung Electronics business; parent listed on KRX); SMIC · HK/SSE
The company has given no date for packaging; its only 2028 to 2029 figure refers to leading-edge capacity overall B
A logic die and several HBM stacks have to be assembled onto one substrate. That step is advanced packaging. Its capacity is limited by deliveries of thinning, dicing, bonding and molding equipment.
Advanced packaging coordinates assembly lines, substrates, HBM and equipment deliveries. CoWoS-related capacity is monitored as an expansion that takes time. Important Japanese and European suppliers do not imply zero US-listed exposure. TSMC’s overall process-capacity outlook is not a packaging-specific convergence date.
- Rev TTM
- $7.458B
- YoY
- +25.6%
- Gross m.
- 15.5%
- Op. margin
- 8.6%
- FCF
- −$172.4M
- Net cash
- —
- P/S
- 1.3×
- Disclosed relationships
- 8
Entities directly connected to companies in this link but not on the 18-link list. Some are genuinely unlisted (OpenAI, Anthropic); others are listed but outside this chain. Dotted boxes are anonymous counterparties that appear in filings as "a customer". The number is how many relationships connect to this link.
Show 5 more entities
- At its October earnings call, TSMC disclosed that advanced packaging at 5× reticle size was in volume production, while 9×, 14× and CoPoS remained in development. It did not provide a date for overall supply-demand balance in advanced packaging. Earlier comments referring to 2028–2029 for the overall process-technology business cannot substitute for an assessment of packaging capacity. B
- Revenue is never broken out; the only figures are verbal, from earnings calls: the chairman put advanced packaging at slightly above 10% of net revenue in October 2025, and the CFO in January 2026 gave slightly above 10% for 2025 with the low teens expected for 2026. B
- Advanced-packaging equipment includes Japanese dicing, molding and bonding vendors and Dutch BESI in hybrid bonding. Major suppliers are not all in this US-listed sample; that does not eliminate indirect or diversified US-listed exposure. The link has 4 sample companies and market-cap CR3 of 99.6%. C
Sources · 4
- B 1 Facts and company outlooks from the originals; dates, periods and conditions are retained in the text. Causal interpretation and verification methods are this map’s analysis. TSMC 3Q26 earnings conference transcript hosted on company IR · 2026-10-15 ↗
- B 2 TSM 4Q25 earnings-call transcript, TSMC 4Q25 Transcript.pdf (2026-01-15), CFO Wendell Huang [B]; 'never broken out' per TSM 20-F 0001628280-26-025362 (FY2025, filed 2026-04-16): revenue by product only Wafer/Others (XBRL R122.htm), Note 38 single operating segment (R166.htm) [A] open source ↗
- C 3 Back-end equipment chokepoints: bonding Shibaura/ASMPT/BESI, grinding and dicing Disco, molding Towa, debonding Tazmo; zero US-listed exposure [C] open source ↗
- C One-line verdict Research interpretation or verification method, not company guidance.
- Continue reviewing revenue breakdowns and packaging-capacity disclosures. Others revenue grew faster than Wafer revenue in 2025, but Others also includes testing, masks, design and licensing revenue. Changes in its growth rate alone cannot establish a turning point in advanced-packaging demand or supply. C
- Track advanced-packaging lead times, customer queues and expansion progress in subsequent TSMC earnings calls. The October 15 disclosure gave no date for packaging supply-demand balance; the earlier 2028–2029 reference for process capacity overall cannot be applied directly. Sustained shorter lead times, lower utilization or separate revenue and profit disclosure would warrant reassessing scarcity and its earnings contribution. B
Sources · 2
- C Watch · how to know this is wrong 1 Research interpretation or verification method, not company guidance.
- B Watch · how to know this is wrong 2 Facts and company outlooks from the originals; dates, periods and conditions are retained in the text. Causal interpretation and verification methods are this map’s analysis. TSMC 3Q26 earnings conference transcript hosted on company IR · 2026-10-15 ↗
Inclusion and other relevant entities
Inclusion: Includes US-listed foundry and assembly/test names with advanced-packaging activities in this sample; equipment and substrate supply require separate review.
Other relevant entities (outside this link’s bars): DISCO / Towa · TSE; Shinko Electric (delisted 2025-06-06; packaging substrates)
Chokepoint cells: CoWoS-related capacity: expansion and delivery watch
Micron’s long-term commitments expand sharply; distinguish prices, bits and cash advances C
AI needs both HBM close to processors and nearline hard drives for high-capacity storage. Their bandwidth, latency, capacity expansion and capital-spending strategies differ, so their shortages need separate analysis.
HBM and nearline HDD serve different workloads; track bit output, shipments and capex separately. HDD supply depends on areal density as well as media/head capacity, drive configuration, yield and mix. A third-party density estimate is not an upper bound on industry supply growth. Announced HBM capacity plans are not commissioning guarantees.
No mid-cap watchlist names in this link. Large/mega and small/micro caps remain in their respective groups. The all-seats basis describes sample valuation weights.
Entities directly connected to companies in this link but not on the 18-link list. Some are genuinely unlisted (OpenAI, Anthropic); others are listed but outside this chain. Dotted boxes are anonymous counterparties that appear in filings as "a customer". The number is how many relationships connect to this link.
Show 1 more entities
- Micron reported fourth-quarter revenue of $54.229 billion for the period ended 2026-09-03 and full-year revenue of $133.188 billion. In FY2026, average selling prices rose approximately 180% for DRAM and 200% for NAND, while bit shipments for both grew in the mid-20% range. Revenue growth cannot be equated directly with growth in bit demand. A
- Micron’s FY2026 Form 10-K disclosed approximately $134 billion of RPO associated with long-term supply commitments. Approximately one quarter was expected to be recognized over the next 12 months, with all RPO expected to be recognized within five years of the reporting-period end; contract liabilities were approximately $13 billion. Advance payments are balance-sheet items, whereas RPO measures future performance obligations. They must not be added together as a total order value. A
- Western Digital reported first-quarter FY2027 revenue of $4.381 billion for the period ended 2026-10-02, up 55% year on year. Net investment in property, plant and equipment was $227 million, compared with $73 million a year earlier and $108 million in the preceding quarter. Quarterly spending has increased substantially, but that alone does not invalidate the long-term capital-expenditure target of 4% to 6% of revenue. A
Sources · 4
- A 1 Facts and company outlooks from the originals; dates, periods and conditions are retained in the text. Causal interpretation and verification methods are this map’s analysis. Micron FY2026 10-K, year ended 2026-09-03 · 2026-10-09 ↗
- A 2 Facts and company outlooks from the originals; dates, periods and conditions are retained in the text. Causal interpretation and verification methods are this map’s analysis. Micron FY2026 10-K, year ended 2026-09-03 · 2026-10-09 ↗
- A 3 Facts and company outlooks from the originals; dates, periods and conditions are retained in the text. Causal interpretation and verification methods are this map’s analysis. WD Q1FY27 8-K exhibit 99.1, quarter ended 2026-10-02 · 2026-10-22 ↗
- C One-line verdict Research interpretation or verification method, not company guidance.
- Review additions to Micron’s RPO, revenue recognition and refund terms each quarter. Most of the approximately $12.75 billion in customer deposits can be returned in 2029–2031; the entire amount cannot be treated as permanent interest-free funding. No single customer accounted for 10% or more of FY2026 revenue. The previously reported 10% concentration covered a different nine-month period. A
- Compare actual spending with revenue using the same company and the same definition of capital expenditure. Western Digital’s $227 million is quarterly net investment. Assess memory and storage capacity expansion, yields and pricing together; a single revenue-growth figure or one quarter’s capex ratio cannot establish a turn in the supply-demand balance. C
Sources · 2
- A Watch · how to know this is wrong 1 Facts and company outlooks from the originals; dates, periods and conditions are retained in the text. Causal interpretation and verification methods are this map’s analysis. Micron FY2026 10-K, year ended 2026-09-03 · 2026-10-09 ↗
- C Watch · how to know this is wrong 2 Research interpretation or verification method, not company guidance.
Inclusion and other relevant entities
Inclusion: Inclusion: US-listed (including ADR) HBM/DRAM, NAND and nearline HDD makers. Samsung Electronics is not US-listed.
Other relevant entities (outside this link’s bars): Samsung Electronics · KRX, Kioxia · TSE
Chokepoint cells: Nearline HDD and HBM: separate supply reviews
22 names crowd into one link, and only two cells score full marks as chokepoints: lithography and test A
Equipment is the machine tool of chipmaking. This link holds more companies than any other on the map, yet conditions inside it are stratified: some names contracted for all of 2025, while in 2026 some next-quarter guidance implies revenue doubling.
Equipment submarkets differ. EUV lithography and ATE are constraints tracked separately here. ASML’s low-NA EUV capacity plan is forward-looking, not the whole lithography market or actual delivery count. Packaging equipment also involves Japanese and European suppliers.
- latest fiscal year
- $880.6M
- YoY
- +31.0%
- Gross m.
- 57.4%
- Op. margin
- 28.8%
- FCF
- $217.9M
- Net cash
- —
- P/S
- 11.2×
- Disclosed relationships
- 3
- Rev TTM
- —
- YoY
- +35.3%
- Gross m.
- —
- Op. margin
- —
- FCF
- $252.5M
- Net cash
- —
- P/S
- —
- Disclosed relationships
- 6
- Rev TTM
- $2.038B
- YoY
- +30.0%
- Gross m.
- 39.3%
- Op. margin
- 13.2%
- FCF
- $86.7M
- Net cash
- —
- P/S
- 4.3×
- Disclosed relationships
- 4
- Rev TTM
- $902.2M
- YoY
- +31.9%
- Gross m.
- 43.1%
- Op. margin
- 12.9%
- FCF
- $136.1M
- Net cash
- —
- P/S
- 8.5×
- Disclosed relationships
- 4
- latest fiscal year
- $496.1M
- YoY
- +15.6%
- Gross m.
- 50.5%
- Op. margin
- 25.8%
- FCF
- $127.5M
- Net cash
- —
- P/S
- 11.4×
- Disclosed relationships
- 9
- Rev TTM
- $950.2M
- YoY
- +122.6%
- Gross m.
- 48.2%
- Op. margin
- 13.2%
- FCF
- $41.13M
- Net cash
- —
- P/S
- 4.1×
- Disclosed relationships
- 3
- Rev TTM
- $1.038B
- YoY
- +36.0%
- Gross m.
- 43.8%
- Op. margin
- 13.3%
- FCF
- −$118.7M
- Net cash
- —
- P/S
- 3.4×
- Disclosed relationships
- 11
- Rev TTM
- $866.1M
- YoY
- +10.6%
- Gross m.
- 43.0%
- Op. margin
- 10.3%
- FCF
- $65.55M
- Net cash
- —
- P/S
- 3.8×
- Disclosed relationships
- 3
Entities directly connected to companies in this link but not on the 18-link list. Some are genuinely unlisted (OpenAI, Anthropic); others are listed but outside this chain. Dotted boxes are anonymous counterparties that appear in filings as "a customer". The number is how many relationships connect to this link.
Show 52 more entities
- ASML is the central EUV lithography supplier examined here; EUV’s competitive structure cannot be generalized to all lithography. The cited plan calls for about 65 low-NA EUV systems in 2026 and 30% more capacity in 2027; actual deliveries still need verification. A
- A verification metric is disappearing. ASML stopped publishing quarterly net bookings from the first quarter of 2026: the figure appeared four times in the last release that still carried it (Q4 2025) and zero times in the Q2 2026 release. A
- Dispersion is wide: revenue was −17.6% at Axcelis for calendar 2025 and −2% at Photronics for FY2025 (year ended October 2025), while Kulicke & Soffa guided its next quarter to an implied +111.2% year over year (a +99.9% to +122.5% range). In the latest reported quarter, traditional ball bonding was 68.4% of revenue and over 80% of the year-over-year increase; the advanced-packaging segment is only 8.9% of revenue and loss-making, so reading the number as AI exposure is a mistake. A
- 22 entities, CR3 75.4%. The weight concentrates in four front-end equipment makers. computed
Sources · 4
- A 1 ASML 6-K 0001628280-26-048235 (CY26Q2 results release, quarter ended 2026-06-30), CEO Fouquet: "add 30% to our 2026 low NA EUV capacity of around 65 for 2027" open source ↗
- A 2 ASML 6-K 0001628280-26-048235 (CY26Q2 results release, quarter ended 2026-06-30), verified word-by-word to contain no bookings figure; ASML CY25Q4 results release (asml.com, quarter ended 2025-12-31), "bookings" appears 4 times, net bookings EUR 13.2B [B] open source ↗
- A 3 ACLS 10-K 0001104659-26-020461 (2025-12-31) 2025 revenue $839M vs $1,018M = -17.6%; PLAB 10-K 0001140361-25-045801 (FY2025) $849M vs $867M = -2%; KLIC 8-K 0000056978-26-000030 Ex-99.1 (2026-08-05, FY26Q3 ended 2026-07-04) FY26Q4 guidance $375M +/- $20M, base from 8-K 0000056978-25-000078 Ex-99.1 (2025-11-19) FY25Q4 $177.558M; KLIC 10-Q 0000056978-26-000032 (2026-07-04) Note 15 segment table: Ball Bonding $226.068M/68.4%, Advanced Solutions $29.415M/8.9%, operating loss -$12.553M; Ball Bonding +197.5% YoY -> prior-year ≈$76.0M, YoY increase ≈$150.1M, ≈82% of the company-wide increase of $182.0M (= $330.409M − $148.413M) [A + computed] open source ↗
- A One-line verdict Primary filings ASML 6-K 0001628280-26-048235 (2026-06-30), TER 8-K 0001193125-26-321933 Ex-99.1 (quarter ended 2026-06-28) open source ↗
- ASML’s new lithography systems sold increased from 67 in the first quarter of 2026 to 86 in the second and 113 in the third. Third-quarter net sales were €11.662 billion, with a gross margin of 57.5%. These are units recognized as sold, not all physical shipments; product mix, revenue recognition and export restrictions also affect the figures. The company still expects supply under its current plans to fall short of demand in 2027–2028. A
- On an event basis, watch the affiliate rule suspension expiring in November 2026. Reinstatement removes the stockpiling incentive at Chinese majority-owned entities and takes equipment-layer China revenue down another step; a further extension cancels the clearest policy variable this layer has in 2026.
Sources · 1
- A Watch · how to know this is wrong 1 Facts and company outlooks from the originals; dates, periods and conditions are retained in the text. Causal interpretation and verification methods are this map’s analysis. ASML 3Q26 6-K exhibit 99.1 · 2026-10-14 ↗
Inclusion and other relevant entities
Inclusion: Inclusion: US-listed (including ADR) front-end and back-end equipment, metrology and materials suppliers. Tokyo Electron, Advantest and Lasertec are not US-listed.
Other relevant entities (outside this link’s bars): Tokyo Electron / Advantest / Lasertec / SCREEN · TSE
Chokepoint cells: EUV lithography and ATE: equipment-specific review
The link closest to AI runs a 17.5% gross margin against 75.0% A
Server assembly puts GPUs, memory, power supplies and chassis into a finished box and racks it. Shipments depend on how much silicon upstream is willing to allocate, which is why pricing power does not sit with the assembler.
This sample covers server brands and EMS/ODM companies. GPU and component supply affects delivery, while bargaining power also depends on customers, design capabilities and contracts. Taiwan-listed ODMs such as Hon Hai, Quanta and Wistron are outside this map.
- Rev TTM
- $12.76B
- YoY
- +69.7%
- Gross m.
- 9.0%
- Op. margin
- 4.2%
- FCF
- $594.1M
- Net cash
- —
- P/S
- 0.7×
- Disclosed relationships
- 2
- Rev TTM
- $1.731B
- YoY
- +67.7%
- Gross m.
- 27.7%
- Op. margin
- 9.6%
- FCF
- −$163.5M
- Net cash
- —
- P/S
- 1.9×
- Disclosed relationships
- 3
Entities directly connected to companies in this link but not on the 18-link list. Some are genuinely unlisted (OpenAI, Anthropic); others are listed but outside this chain. Dotted boxes are anonymous counterparties that appear in filings as "a customer". The number is how many relationships connect to this link.
Show 7 more entities
- 9 entities worth $485.6B combined, 1.29% of the chain. computed
- Super Micro grew revenue +93% year over year in fiscal Q4 2026 (quarter ended 2026-06-30), the same order of magnitude as NVIDIA. Gross margin for the quarter was 17.5%; NVIDIA's was 75.0%. A
- Celestica’s CCS segment accounted for 81% of revenue in the quarter ended June 2026, with a segment margin of 8.66%. Third-quarter results are scheduled for release after the market close on 2026-10-26. On new orders, HPE disclosed a $1.2 billion order from Vultr for AMD Helios systems on 2026-09-30; the entire amount cannot be attributed to AMD chip revenue. B
Sources · 3
- A 2 SMCI 8-K EX-99.1 exhibit991_20260630.htm (FY2026Q4 ended 2026-06-30, filed 2026-08-11, unaudited); NVDA 10-Q 0001045810-26-000075 (FY2027Q2 ended 2026-07-26, filed 2026-08-26) open source ↗
- B 3 Facts and company outlooks from the originals; dates, periods and conditions are retained in the text. Causal interpretation and verification methods are this map’s analysis. HPE first AMD Helios order from Vultr · 2026-09-30 ↗ Celestica Q3 release schedule · 2026-10-06 ↗ Prior-period filing [A] ↗
- A One-line verdict Underlying filings: SMCI 8-K EX-99.1 exhibit991_20260630.htm (2026-06-30); NVDA 10-Q 0001045810-26-000075 (2026-07-26); CLS 10-Q 0001030894-26-000044 (2026-06-30) open source ↗
- Quarterly, read Super Micro's gross margin: 17.5% now against 75.0% at NVIDIA in the same period. Gross margin breaking above 20% and holding for two quarters would show bargaining power moving downstream, and this chapter's claim that margin does not keep pace fails.
- Celestica’s historical baseline remains the quarter ended June: CCS at 81% of revenue and an 8.66% segment margin. For the next reporting period, examine customer concentration, product mix, service revenue and costs together. Margin expansion alone does not establish sustained pricing power for the contract manufacturer. C
Sources · 1
- C Watch · how to know this is wrong 2 Research interpretation or verification method, not company guidance.
Inclusion and other relevant entities
Inclusion: Inclusion: US-listed AI server brands and EMS / ODM providers.
Other relevant entities (outside this link’s bars): Hon Hai / Quanta / Wistron / Wiwynn · TWSE
NVIDIA put $6 billion to work in 30 days, and two of the three deals bought access to laser-component capacity A
Hundreds of thousands of GPUs have to talk to each other, and light carries the traffic. Optical module assembly has many participants, and the global leader, Innolight, is listed on the China A-share market and does not appear on this map. The scarcity sits in one part inside the module: the indium phosphide laser chip. US-listed exposure to copper connectors, optical fiber and indium phosphide substrates (Amphenol, Corning, AXT) has been added to this layer.
This link separates switching/protocols, interconnect chips, optical modules/components, copper links and fiber. AXT offers InP-substrate exposure. Laser shortages and expansions require company- and product-level checks. CPO/LPO alter parts of the architecture; a third-party forecast date is not a guaranteed end to shortages.
- Rev TTM
- $596M
- YoY
- +86.4%
- Gross m.
- 28.9%
- Op. margin
- -11.3%
- FCF
- —
- Net cash
- —
- P/S
- 9.6×
- Disclosed relationships
- 9
- Rev TTM
- $125.5M
- YoY
- +164.8%
- Gross m.
- 32.2%
- Op. margin
- 3.1%
- FCF
- −$19.57M
- Net cash
- —
- P/S
- 27.2×
- Disclosed relationships
- 4
Entities directly connected to companies in this link but not on the 18-link list. Some are genuinely unlisted (OpenAI, Anthropic); others are listed but outside this chain. Dotted boxes are anonymous counterparties that appear in filings as "a customer". The number is how many relationships connect to this link.
Show 45 more entities
- In March 2026 NVIDIA invested $2 billion each into Lumentum, Coherent and Marvell inside 30 days. The first two bought purchase commitments and capacity access; the Marvell investment is a silicon photonics joint development. A
- The gap is around 30%: a third-party transcript of the company's earnings call and LightCounting put it at the same order of magnitude, and both are third-party readings. Capacity is already up 20% and the imbalance widened anyway; long-term contracts lock existing capacity through 2027. Broadcom's FQ3 2026 call on 2026-09-02, for the quarter ended 2026-08-02, added one more supply-side reading: management said demand for EML and CW lasers is far surpassing industry supply, and that Broadcom is more than tripling capacity year on year at its EML, CW, VCSEL and indium-phosphide plants in the US and Singapore. That is a qualitative statement about capacity under construction, not capacity already in place. C
- Pricing power lands with the name closest to the chokepoint: Lumentum expanded non-GAAP gross margin by 1,130 basis points in fiscal 2026 (year ended June 2026), reaching 50.4% in the fourth fiscal quarter; Coherent expanded 152 basis points in its own fiscal 2026, which also ended in June 2026. A
- On 2026-10-21, NVIDIA and its supply-chain partners announced capacity expansions. SPIL plans to expand CPO optical-engine capacity to 15 times its current level by mid-2027, then double it again by the end of 2028. This is a company capacity plan, not output already achieved, and it does not measure upstream indium-phosphide laser capacity. It cannot establish that EML constraints have already eased. B
Sources · 5
- A 1 LITE 8-K 0001193125-26-085412 Item 3.02 + Ex-99.1 (2026-03-02): 2,876,415 Series A convertible preferred shares @ $695.31 = $2B, non-exclusive agreement with multi-billion-dollar purchase commitment and future capacity access rights for advanced laser components; COHR 8-K 0001193125-26-084366 Item 3.02 + 7.01 + Ex-99.1 (2026-03-02): 7,788,161 common shares @ $256.80 = $2B, purchase commitment plus future access and capacity rights for advanced laser and optical networking products; MRVL 8-K 0001193125-26-134462 Item 3.02 (2026-03-31): 2,000,000 Series A convertible preferred shares = $2B, silicon photonics co-development open source ↗
- C 2 Lumentum CEO Michael Hurlston, FY2026 Q2 earnings call (third-party transcription via Chipstrat; official transcript not obtained): "supply shortfall to customer demand about 30%; even after adding 20% capacity the imbalance widened"; LightCounting April-2026 Market Forecast: "growth again constrained by InP EML and laser chip capacity; demand exceeds supply by 30%"; TrendForce 2025-12-08 (all EML capacity locked by LTAs through calendar 2027; NVIDIA pre-allocated most capacity, lead times extend beyond 2027) open source ↗
- A 3 LITE 8-K 0001628280-26-055726 Ex-99.1 (2026-08-11, FY2026 ended 2026-06-27): non-GAAP gross margin FY2026 46.0% vs FY2025 34.7% = +1,130bps, FY26Q4 50.4% vs 37.8% = +1,260bps; COHR 8-K 0001193125-26-346860 Ex-99.1 (2026-08-12, FY2026 ended 2026-06-30) Table 1: non-GAAP gross margin 39.4% vs 37.9% = +152bps open source ↗
- B 4 Facts and company outlooks from the originals; dates, periods and conditions are retained in the text. Causal interpretation and verification methods are this map’s analysis. NVIDIA supply-chain capacity announcement · 2026-10-21 ↗
- C One-line verdict LightCounting April-2026 Market Forecast: "demand exceeds supply by 30%, but the shortage should disappear by end-2026; if TSMC ships more GPUs than expected, the optics shortage will extend into 2027"; LightCounting March-2026 Ethernet Optics and March-2026 quarterly update (InP laser shortage easing, faster price declines by year-end); TrendForce 2025-12-08 (EML lead times extend beyond 2027, LTAs locked through 2027) open source ↗
- Use Lumentum’s fourth-quarter FY2026 non-GAAP gross margin of 50.4% as a dated historical baseline, and track subsequent actual shipments, prices and product mix. Margin changes alone cannot isolate EML scarcity; non-GAAP adjustments and acquisition effects also require attention. C
- Record the product scope, observation period and revisions of the original LightCounting and TrendForce forecasts separately. The earlier estimates of an approximately 30% shortfall and approximately 20% capacity expansion are historical third-party figures. No comparable October shortfall data was obtained in this review, so they are not presented as current measurements. C
Sources · 2
- C Watch · how to know this is wrong 1 Research interpretation or verification method, not company guidance.
- C Watch · how to know this is wrong 2 Research interpretation or verification method, not company guidance.
Inclusion and other relevant entities
Inclusion: Inclusion: US-listed suppliers of data-center switching, interconnect silicon, optical modules and components, copper interconnect and fibre, and compound-semiconductor substrates. A-share optical module leaders such as Innolight are absent.
Other relevant entities (outside this link’s bars): Innolight / Eoptolink · SZSE, AIXTRON · XETRA, IQE · LSE
Chokepoint cells: InP/EML lasers: capacity milestones and delivery checks
Eaton’s $9.549B Boyd Thermal acquisition brings liquid cooling into a diversified group A
This link covers switchgear, UPS, batteries, coolant-distribution units, cold plates and fluids. Boyd Thermal belonged to privately held Boyd before Eaton acquired it in March 2026; no standalone listed liquid-cooling company was delisted. US-listed exposure still depends on each company’s business mix.
Covers switchgear, UPS/batteries, air cooling/HVAC, liquid cooling/fluids and board-level power. Eaton acquired the privately held Boyd Thermal business, not a standalone listed liquid-cooling company. Backup generators are in link 11 and grid transformers/GIS in link 10. Untiered does not mean unconstrained delivery.
- Rev TTM
- $2.614B
- YoY
- +20.4%
- Gross m.
- 39.3%
- Op. margin
- 3.7%
- FCF
- $444.4M
- Net cash
- —
- P/S
- 3.4×
- Disclosed relationships
- 3
- Rev TTM
- —
- YoY
- +1.6%
- Gross m.
- —
- Op. margin
- —
- FCF
- $51.27M
- Net cash
- —
- P/S
- —
- Disclosed relationships
- 2
- Rev TTM
- $3.372B
- YoY
- +28.0%
- Gross m.
- 22.2%
- Op. margin
- 10.1%
- FCF
- $100.2M
- Net cash
- —
- P/S
- 2.1×
- Disclosed relationships
- 6
- Rev TTM
- $3.794B
- YoY
- +4.8%
- Gross m.
- 30.5%
- Op. margin
- 13.0%
- FCF
- $717.3M
- Net cash
- —
- P/S
- 1.6×
- Disclosed relationships
- 1
- Rev TTM
- $1.932B
- YoY
- +101.2%
- Gross m.
- 25.6%
- Op. margin
- 11.0%
- FCF
- —
- Net cash
- —
- P/S
- 2.9×
- Disclosed relationships
- 3
- Rev TTM
- —
- YoY
- +8.9%
- Gross m.
- —
- Op. margin
- —
- FCF
- $244M
- Net cash
- —
- P/S
- —
- Disclosed relationships
- 2
Entities directly connected to companies in this link but not on the 18-link list. Some are genuinely unlisted (OpenAI, Anthropic); others are listed but outside this chain. Dotted boxes are anonymous counterparties that appear in filings as "a customer". The number is how many relationships connect to this link.
Show 28 more entities
- Eaton acquired Boyd Thermal for $9.549 billion in March 2026. Intangibles plus goodwill came to 114% of consideration; what was bought is capacity and customer relationships. A
- On 2026-09-24, Vertiv signed an agreement to acquire King Environmental Services, adding fluid management, commissioning and load-testing capabilities in EMEA. Financial terms were not disclosed, and closing is expected in the fourth quarter. This agreement is presented separately from the earlier UtilityInnovation Group transaction. Neither should be treated as a completed acquisition or consolidated business before closing is verified. B
- On 2026-10-01, Modine completed the spin-off of Performance Technologies and its combination with Gentherm, receiving approximately $156 million in cash, which it used to repay debt. The previously reported data center revenue share of 39.9% and segment gross margin of 20.2% retain their original reporting period through June. Subsequent year-on-year comparisons must use figures restated for discontinued operations. The proposed name change to Modexus Solutions still requires shareholder approval. B
- 18 entities, CR3 46.4%. Backup generator sets now sit in link 11; UPS batteries and immersion coolants are added in this edition. computed
Sources · 4
- A 1 ETN 10-Q 0001551182-26-000030 (2026-06-30)
- B 2 Facts and company outlooks from the originals; dates, periods and conditions are retained in the text. Causal interpretation and verification methods are this map’s analysis. Official disclosure ↗
- B 3 Facts and company outlooks from the originals; dates, periods and conditions are retained in the text. Causal interpretation and verification methods are this map’s analysis. Official disclosure ↗ Prior-period filing [A] ↗
- C One-line verdict CBRE, North America Data Center Trends H1 2026 (2026-08-27); BTDR 6-K EX-99.1 0001213900-26-093742 (2026-08-26, site data as of 2026-07-31) [A] open source ↗
- Track Modine’s segment gross margin, output, lead times and product mix on a consistent basis, and check the restatements following the spin-off. VRT plans to release third-quarter results on 2026-10-28 and Eaton on 2026-11-03. As of this update, estimates are not substituted for reported results. A margin recovery at one company cannot, by itself, establish that industry-wide supply constraints have eased. B
- Annually, read the goodwill and intangibles note in Eaton's 10-K: intangibles plus goodwill came to 114% of the $9.549 billion paid for Boyd Thermal. An impairment would mean the capacity and customer relationships bought have not materialised, and this chapter's reading that liquid cooling was absorbed by a large electrical vendor needs revisiting.
Sources · 1
- B Watch · how to know this is wrong 1 Facts and company outlooks from the originals; dates, periods and conditions are retained in the text. Causal interpretation and verification methods are this map’s analysis. Official disclosure ↗ Official disclosure ↗ Official disclosure ↗
Inclusion and other relevant entities
Inclusion: Inclusion: US-listed suppliers of power distribution, UPS, cooling and board-level power equipment for data halls.
Other relevant entities (outside this link’s bars): Schneider Electric · Euronext, ABB · SIX, Delta Electronics · TWSE, Munters · Nasdaq Stockholm
Transmission and distribution expansion depends on project delivery; historical lead times must retain their observation dates C
Connecting a data center to the grid means completing everything from the high-voltage line to the switchgear. This link is not short of orders. It is short of an equipment delivery calendar.
Contractors and electrical-equipment vendors share this link; diversified names use full-company market cap, not transmission/distribution business value. Transformer/GIS lead times vary by specification, region and order. Third-party long-lead examples and 2027–2030 expansion plans are research inputs, not a uniform delivery schedule.
- Rev TTM
- —
- YoY
- +8.9%
- Gross m.
- —
- Op. margin
- —
- FCF
- $244M
- Net cash
- —
- P/S
- —
- Disclosed relationships
- 2
Entities directly connected to companies in this link but not on the 18-link list. Some are genuinely unlisted (OpenAI, Anthropic); others are listed but outside this chain. Dotted boxes are anonymous counterparties that appear in filings as "a customer". The number is how many relationships connect to this link.
- The previously cited lead times of more than 160 weeks for substation-class transformers and approximately 125 weeks for high-voltage circuit breakers are earlier third-party observations, not October measurements obtained for this update. On 2026-09-25, Eaton signed an agreement to acquire COL Group at an enterprise value of €810 million, with closing expected in the first quarter of 2027. Acquiring existing medium-voltage distribution capabilities does not represent net new industry capacity and does not establish that high-voltage transformer lead times have shortened. B
- This link holds both contractors and T&D equipment makers: GE Vernova (Electrification segment), Eaton, Hubbell and Powell are counted across layers at full-company market cap, together 70.4%. There is no pure-play high-voltage transformer maker listed in the US, so the top weight's core business extends well beyond this link. computed
- Backlog is not orders: MasTec states that about 40% of its 18-month backlog comes from cancellable master service agreements, while at Quanta such agreements are 41% of total backlog and 33% of the 12-month figure. The two companies define backlog differently and the numbers are not comparable. A
Sources · 3
- B 1 Facts and company outlooks from the originals; dates, periods and conditions are retained in the text. Causal interpretation and verification methods are this map’s analysis. Official disclosure ↗
- A 3 MTZ 10-Q 0000015615-26-000093 (2026-06-30): “estimated 18-month backlog” $21.39B, MSAs 40% of backlog, customers not contractually committed to a minimum amount, most agreements cancellable on short or no notice; PWR 10-Q 0001050915-26-000025 (2026-06-30): MSAs 33% of 12-month backlog and 41% of total backlog, no contractual volume commitment from customers; PWR 8-K EX-99.1 0001193125-26-324855 (2026Q2) record total backlog $53.4B open source ↗
- C One-line verdict Research interpretation or verification method, not company guidance.
- Keep voltage class, equipment type, geography and observation date consistent when updating lead times. No comparable October lead-time data were obtained in this review. Retain the historical observations pending new evidence, and do not use acquisition announcements as a substitute for actual delivery data. C
- Compare contractors’ actual backlog conversion into revenue, new orders and the share of cancellable agreements each quarter. Backlog definitions differ by company. A year-on-year decline in a single quarter may also reflect faster delivery, project cancellations or a change in reporting scope, and should be assessed alongside cash flow and execution progress. C
Sources · 2
- C Watch · how to know this is wrong 1 Research interpretation or verification method, not company guidance.
- C Watch · how to know this is wrong 2 Research interpretation or verification method, not company guidance.
Inclusion and other relevant entities
Inclusion: Includes sampled US-listed grid contractors and electrical vendors with transformer, switchgear or GIS activities. Omitted smaller contractors may have relevant operations. Multi-link names use full-company market cap.
Other relevant entities (outside this link’s bars): Siemens Energy · XETRA; Hitachi Energy (subsidiary of TSE-listed Hitachi); Hyundai Electric · KRX; TBEA · SSE
Chokepoint cells: HV transformers/GIS: specification-specific lead times
Gas turbine orders and slot reservations are separate measures; 20 GW is the company’s annualized output target C
This link is the chain's power outlet: gas turbines, nuclear and conventional generation, and on-site generation and backup power. Unusually, it writes its capacity path into public materials. Which year capacity is added, and how much can be built in a year, are both verifiable.
This link includes turbine OEMs, generators, on-site/backup equipment and SMR developers; fuel is in link −1. GE Vernova’s 53GW equipment orders and 116GW including cancellable reservations have different bases. Against 20GW annual output they imply static ratios of about 2.7 and 5.8 years, not delivery forecasts. Other suppliers, existing plants and new projects can change regional supply.
- Rev TTM
- —
- YoY
- —
- Gross m.
- —
- Op. margin
- —
- FCF
- —
- Net cash
- —
- P/S
- —
- Disclosed relationships
- 1
Entities directly connected to companies in this link but not on the 18-link list. Some are genuinely unlisted (OpenAI, Anthropic); others are listed but outside this chain. Dotted boxes are anonymous counterparties that appear in filings as "a customer". The number is how many relationships connect to this link.
Show 20 more entities
- At the end of June 2026, GE Vernova had 53 GW of gas turbine equipment backlog and a further 63 GW of production slot reservations, totaling 116 GW. Using the company’s targeted annualized output capacity of 20 GW as a static denominator gives approximately 2.7 years and 5.8 years, respectively. The denominator is not verified actual full-year shipments, and the results are not customer lead times. Third-quarter results are scheduled for release on 2026-10-28. B
- Prices have already moved: GE Vernova states that equipment order pricing in the first half of 2026 ran more than 20% above the fourth quarter of 2025. B
- At the source cutoff, future commercial output and commissioning dates for SMRs remain uncertain. Track Oklo’s NRC licensing work separately from its DOE authorization path. NRC’s project page updated September 15, 2026 lists Aurora pre-application activities. Power delivery depends on each project’s authorization, construction and commissioning. B
- 13 entities, CR3 68.8%. GE Vernova alone holds 21.2%; the three backup-power names (Caterpillar, Cummins, Generac) together hold 38.9%. computed
Sources · 4
- B 1 Facts and company outlooks from the originals; dates, periods and conditions are retained in the text. Causal interpretation and verification methods are this map’s analysis. Official disclosure ↗ Official disclosure ↗
- B 2 GEV Q2 2026 earnings call (2026-07-22) open source ↗
- B 3 NRC Oklo Aurora Powerhouse project page: pre-application activities. Its status is not a forecast of future output from all SMRs.; 2026-09-23 update: NRC Oklo Aurora Powerhouse project page (footer: Page Last Reviewed/Updated Tuesday, September 15, 2026): still pre-application activities; the page lists no docketed COLA. Its status is not a forecast of future output from all SMRs. open source ↗
- B One-line verdict GEV Q2 2026 earnings call (2026-07-22) (CEO output ramp: 20 GW annualized by Q3 2026 -> 24 GW 2028 -> 30 GW 2030); GEV 8-K EX-99.1 0001996810-26-000147 (2026-06-30) open source ↗
- Track signed equipment orders, cancellable slot reservations, actual shipments and the ramp-up of annualized capacity separately. Both the 53 GW and 116 GW figures retain their June reporting date. A decline in the order-to-capacity ratio may reflect deliveries, cancellations or capacity additions; it cannot be interpreted on its own as weakening demand. C
- Compare quarterly shipments with company capacity guidance and full-year delivery targets. A quarter below a research threshold is not proof of ramp failure; year-end orders below a target do not alone prove peak demand. Check cancellations, pricing and delivery schedules.
Sources · 1
- C Watch · how to know this is wrong 1 Research interpretation or verification method, not company guidance.
Inclusion and other relevant entities
Inclusion: Includes sampled US-listed turbine OEMs, generators, on-site/backup vendors and SMR developers. Power announcements can concern signed agreements, development, permitting or operation; read the project-specific status.
Other relevant entities (outside this link’s bars): Siemens Energy · XETRA, Mitsubishi Heavy Industries · TSE, Doosan Enerbility · KRX
Chokepoint cells: Turbines: signed orders separate from cancellable reservations
Contracted capacity, energization and billable service are distinct stages C
This link leases already-energized megawatts on long-term contracts, mostly to cloud providers and model companies, on terms running from the teens into the twenties in years. Its market-cap weight is far smaller than the cloud link's (the two are not measured alike: more than 90% of the cloud link's market cap is the full-company value of giants that span several layers), yet it carries the longest-dated contracts in the chain.
REITs, hosts and mining-to-AI projects differ in contract term, capacity basis, energization and revenue recognition. Disclosed base-term values must not be added to revenue-derived estimates as one signed-contract total; queues and conditional classifications are not secured power. Full market caps of AMT, IRM and others cannot establish link business value or concentration bounds.
- Rev TTM
- $318M
- YoY
- +81.4%
- Gross m.
- —
- Op. margin
- -295.3%
- FCF
- —
- Net cash
- —
- P/S
- 23.7×
- Disclosed relationships
- 15
- Rev TTM
- $57.37B
- YoY
- -1.2%
- Gross m.
- —
- Op. margin
- —
- FCF
- −$1.89B
- Net cash
- —
- P/S
- —
- Disclosed relationships
- 6
- Rev TTM
- $165.2M
- YoY
- -6.0%
- Gross m.
- 40.2%
- Op. margin
- -250.4%
- FCF
- −$2.504B
- Net cash
- —
- P/S
- 34.2×
- Disclosed relationships
- 16
- Rev TTM
- $872.3M
- YoY
- +322.4%
- Gross m.
- —
- Op. margin
- -33.1%
- FCF
- −$4.455B
- Net cash
- —
- P/S
- 6.3×
- Disclosed relationships
- 17
- Rev TTM
- $674.5M
- YoY
- +13.9%
- Gross m.
- —
- Op. margin
- -199.2%
- FCF
- −$776.7M
- Net cash
- —
- P/S
- 7.0×
- Disclosed relationships
- 9
- Rev TTM
- $440.3M
- YoY
- +108.8%
- Gross m.
- 28.3%
- Op. margin
- -127.4%
- FCF
- −$957.7M
- Net cash
- —
- P/S
- 9.6×
- Disclosed relationships
- 10
- Rev TTM
- $191.1M
- YoY
- -43.0%
- Gross m.
- —
- Op. margin
- -278.1%
- FCF
- −$1.49B
- Net cash
- −$4.715B
- P/S
- 18.9×
- Disclosed relationships
- 15
Entities directly connected to companies in this link but not on the 18-link list. Some are genuinely unlisted (OpenAI, Anthropic); others are listed but outside this chain. Dotted boxes are anonymous counterparties that appear in filings as "a customer". The number is how many relationships connect to this link.
Show 78 more entities
- On 2026-09-25, Cipher disclosed that the overall Barber Lake arrangements had been extended to 20 years, increasing expected contracted revenue from approximately $3.8 billion to more than $9 billion. The incremental approximately $5.2 billion relates to an unnamed AI lab’s binding commitment for a further ten years, to be documented in a separate lease. It cannot all be attributed to Fluidstack’s original lease or treated as cash already received. Delivery of individual data halls is now expected from the fourth quarter of 2026 through the first quarter of 2027, with rent beginning after delivery. B
- Barber Lake’s longer contractual term comes with construction funding pressure. Cipher will bear the first $359.3 million of costs above the original budget. The tenant will reimburse 50% of costs above that threshold through additional rent over the combined 20-year term. The timing gap between the owner’s expenditure and rental receipts remains; growth in total contracted revenue is no substitute for assessing project returns. B
- Google is not a lessee, yet it is the credit hub of this link: it backstopped $6.23 billion for the unlisted Fluidstack in exchange for warrants struck at one cent. A
Sources · 4
- B 1 Facts and company outlooks from the originals; dates, periods and conditions are retained in the text. Causal interpretation and verification methods are this map’s analysis. Official disclosure ↗
- B 2 Facts and company outlooks from the originals; dates, periods and conditions are retained in the text. Causal interpretation and verification methods are this map’s analysis. Official disclosure ↗
- A 3 WULF 8-K 2025-08-14 / 2025-10-28 (Recognition Agreement and Abernathy backstop, $4.5bn combined); CIFR 8-K 2025-09-25 / 2025-11-20 ($1.73bn cumulative); warrants struck at $0.01 in the same 8-Ks
- B One-line verdict Facts and company outlooks from the originals; dates, periods and conditions are retained in the text. Causal interpretation and verification methods are this map’s analysis. Official disclosure ↗
- Track contracting, energization, acceptance and rent commencement for each project on a consistent basis. On 2026-10-21, IREN disclosed that its 300 MW Badajoz campus in Spain had obtained a civil works permit, with initial operations targeted for 2028. The announcement did not identify this capacity as operating IT load or disclose that billing had begun at the campus. Galaxy’s more than 5.7 GW remains potential capacity, with third-quarter results scheduled for 2026-10-27. B
- ERCOT’s published large-load queue of 474 GW is a June 2026 snapshot, approximately 90% of which consists of data centers, rather than a live October total. Batch Zero classification is not equivalent to final energization. In its 2026-10-19 response, TCEQ confirmed that it had paused issuing permits directly supporting data center development and was screening related authorizations. The letter gave no date for a full resumption and did not mean that all existing projects had been ordered to stop work. B
Sources · 2
- B Watch · how to know this is wrong 1 Facts and company outlooks from the originals; dates, periods and conditions are retained in the text. Causal interpretation and verification methods are this map’s analysis. Official disclosure ↗ Official disclosure ↗
- B Watch · how to know this is wrong 2 Facts and company outlooks from the originals; dates, periods and conditions are retained in the text. Causal interpretation and verification methods are this map’s analysis. Official disclosure ↗ Official disclosure ↗
Inclusion and other relevant entities
Inclusion: Inclusion: US-listed data-center REITs, hosting operators, miners converting to hosting, and infrastructure owners with a data-center segment (AMT and IRM flagged as partial exposure).
Other relevant entities (outside this link’s bars): Crusoe / Lambda / Nscale (unlisted)
Chokepoint cells: Grid connection: application, allocation and energization stages
Oracle Q1 FY2027 RPO reaches $664B; contract scale and current revenue are different measures A
Cloud is the link with the densest circular transactions in the chain: the party writing the check, the party selling the silicon and the party renting the rack are often the same set of names. In the previous link Google backstopped a host operator. Here, the backstop has become a standard term.
Oracle reported $664B RPO at August 31 in its September 10, 2026 release. Historical customer revenue shares in the FY2026 10-K do not reveal current RPO concentration. Cloud, compute purchases and investments require separate checks. Repeated full-company market caps describe sample valuation weights, not circular transactions or industry concentration.
No mid-cap watchlist names in this link. Large/mega and small/micro caps remain in their respective groups. The all-seats basis describes sample valuation weights.
Entities directly connected to companies in this link but not on the 18-link list. Some are genuinely unlisted (OpenAI, Anthropic); others are listed but outside this chain. Dotted boxes are anonymous counterparties that appear in filings as "a customer". The number is how many relationships connect to this link.
Show 27 more entities
- Oracle’s September 10, 2026 release reports $664B of RPO for Q1 FY2027 ended August 31, up from $638B at May 31; the 10-Q filed September 11 expects about 13% of it to be recognized as revenue over the next twelve months, 37% in months 13 to 36 and 34% in months 37 to 60. Its FY2026 10-K said no single customer accounted for 10% or more of annual revenue. That historical recognized-revenue measure does not establish the customer mix of current RPO. A
- Backstopping unsold capacity went from one-off to standard term: NVIDIA to CoreWeave at $6.3 billion, Meta to Nebius at $15 billion. A
- CoreWeave's quarterly net interest expense was $640 million, equal to a quarter of revenue in the same period. A
- This link totals $13.32T, 35.46% of the chain, ranking No. 2 of the 18 links by market cap. computed
Sources · 4
- A 1 Oracle Q1 FY2027 earnings exhibit, September 10, 2026, period ended August 31; historical customer revenue concentration from the FY2026 10-K ended May 31.; 2026-09-23 update: ORCL 10-Q Q1 FY2027 0001193125-26-389274 (period 2026-08-31, filed 2026-09-11), Note 1 Remaining Performance Obligations from Contracts with Customers: $664 billion; approximately 13% / 37% / 34% open source ↗
- A 2 CRWV 8-K 0001769628-25-000047 (event 2025-09-09, filed 2025-09-15); NBIS 6-K 0001104659-26-027886 tm268879d1_6k.htm (agreement 2026-03-13, filed 2026-03-16) open source ↗
- A 3 CRWV 10-Q 0001769628-26-000366 (period 2026-06-30, filed 2026-08-12); CRWV 8-K earnings release 0001769628-26-000362 coreweave2q26earningspress.htm (2026-08-11) open source ↗
- B One-line verdict Facts and company outlooks from the originals; dates, periods and conditions are retained in the text. Causal interpretation and verification methods are this map’s analysis. Official disclosure ↗
- Use $664B RPO at August 31, 2026 as the baseline. Track new contracts, revenue conversion (the 10-Q expects about 13% to be recognized over the next twelve months), cancellations and customer disclosures (the 10-Q says only that the year-on-year increase came primarily from certain significant cloud contracts) separately. Consecutive quarterly declines warrant review but do not alone prove weaker demand; historical revenue concentration and future RPO need distinct analysis.
- Track CoreWeave’s net interest expense, operating cash flow, capitalized interest and revenue recognition over matching periods. The interest-to-revenue ratio measures financing burden, but it is also affected by interest rates, debt levels and capitalization policies. On its own, it cannot establish that delivery cycles are lengthening. C
Sources · 1
- C Watch · how to know this is wrong 2 Research interpretation or verification method, not company guidance.
Inclusion and other relevant entities
Inclusion: Inclusion: US-listed hyperscale clouds and compute-rental providers (neoclouds). Lambda, Nscale and Crusoe are not listed.
Other relevant entities (outside this link’s bars): Lambda / Nscale / Crusoe (unlisted)
The entities ranked 2 and 8 in the network are not on any exchange computed
The model link places the orders that travel upstream: power, racks and silicon all originate here. What is buyable on US exchanges is only part of it, and the two entities that actually define this link are not on the list.
The listed sample includes SpaceX (xAI), Alibaba and Baidu at full-company market caps, not model-only valuations. OpenAI and Anthropic’s standalone listing status requires confirmed exchange trading. Confidential submission, a public S-1 and listing are distinct events; filing reports alone do not change classification.
No mid-cap watchlist names in this link. Large/mega and small/micro caps remain in their respective groups. The all-seats basis describes sample valuation weights.
Entities directly connected to companies in this link but not on the 18-link list. Some are genuinely unlisted (OpenAI, Anthropic); others are listed but outside this chain. Dotted boxes are anonymous counterparties that appear in filings as "a customer". The number is how many relationships connect to this link.
Show 14 more entities
- OpenAI and Anthropic have no standalone listed shares. Among 907 disclosed company relationships recorded here, Anthropic has 25 ties and ranks 2; OpenAI has 18 and ranks 8. Counts include signed agreements and disclosed existing business ties, not individual legal contracts. computed
- Of Amazon's $62.6 billion in net income for the second quarter of 2026, $53.4 billion was pre-tax other income. That figure is on a different basis from after-tax net income and cannot simply be subtracted from it. The filing attributes it mainly to Amazon's investment in Anthropic, which is not listed. A
- SpaceX listed after combining with xAI and is the only one of the eight filing-level buyers that prints AI segment capex into its filings: $23.55 billion in the first half. A
- Only 5 listed entities sit in this link, CR3 96.6%. computed
Sources · 3
- A 2 AMZN 8-K Ex-99.1 0001018724-26-000024 (filed 2026-07-30, period 2026-06-30); AMZN 10-Q 0001018724-26-000026 (2026-06-30): Q2 other income (expense), net $53.415B, mainly upward adjustment of Anthropic non-voting preferred stock open source ↗
- A 3 SPCX 10-Q 0001628280-26-052535 (period 2026-06-30, filed 2026-08-04), segment note: AI segment H1 2026 capital expenditures $23,551M (company-wide $28,476M); 'Common Control Mergers' note records the xAI merger on 2026-02-02; SPCX 424B4 0001628280-26-042639 (2026-06-12) Nasdaq listing open source ↗
- B One-line verdict Facts and company outlooks from the originals; dates, periods and conditions are retained in the text. Causal interpretation and verification methods are this map’s analysis. Official disclosure ↗
- Track public registration filings from Anthropic and OpenAI. A public S-1 can add verifiable financial information, but submission, publication, effectiveness and the start of trading are distinct events. Only confirmed exchange trading changes the absence of standalone listed shares.
- Reconcile Amazon’s investment remeasurement note, income statement and cash-flow statement. Q2 2026 net income of $62.6B and pre-tax other income of $53.4B are not directly subtractable or components on the same after-tax basis. Establish noncash treatment from notes and cash-flow adjustments, not from whether the line later turns negative.
Inclusion and other relevant entities
Inclusion: Includes recorded US-listed model developers and product companies. Microsoft is not separately listed in this link and appears in cloud/applications; this does not deny its model development or claim an exhaustive industry list.
Other relevant entities (outside this link’s bars): OpenAI / Anthropic / Mistral / DeepSeek (unlisted; filing and listing status require separate checks)
Microsoft holds 72.6%, while also being counted in Accelerator Design, Cloud & Compute computed
This is one of the links closest to end payment: contracts and leases upstream are ultimately settled by subscription, licence and model API revenue. Its boundary is also the blurriest on the map: these 13 names are a sample, not the full set.
This link is a terminus on this map; nothing flows out of it.
Applications and data services have open boundaries; this is a representative sample. Companies mix AI with other activities, so revenue and profit require segment-level checks. A small market-cap weight does not mean immaterial revenue, and full-company valuation cannot establish AI application share.
No mid-cap watchlist names in this link. Large/mega and small/micro caps remain in their respective groups. The all-seats basis describes sample valuation weights.
Entities directly connected to companies in this link but not on the 18-link list. Some are genuinely unlisted (OpenAI, Anthropic); others are listed but outside this chain. Dotted boxes are anonymous counterparties that appear in filings as "a customer". The number is how many relationships connect to this link.
Show 19 more entities
- Microsoft holds 72.6% of this link’s sample market cap and also appears in Accelerator Design, Cloud & Compute. Each link uses its full market cap; this cannot allocate application-business value or establish application market share. computed
- BBAI, AI and INOD, at the lower end of the sample, together account for 0.1%. On 2026-10-06, OpenAI and Atlassian expanded their collaboration across Rovo, Codex and ChatGPT Enterprise, disclosing that more than 3,000 developers use Codex. User counts are not paid seats, ARR or evidence of profitability. Contract value was not disclosed. B
- The model link is acquiring applications in the other direction: in June 2026 SpaceX signed a merger agreement with Cursor, which is not listed, and the deal closed on 2026-08-14 at an implied equity value of $60 billion. That figure is the deal's implied valuation and is not equivalent to a listed company's market cap. A
Sources · 3
- B 2 Facts and company outlooks from the originals; dates, periods and conditions are retained in the text. Causal interpretation and verification methods are this map’s analysis. Official disclosure ↗
- A 3 SPCX 8-K 0001628280-26-043411 (Item 1.01, 2026-06-16); SPCX 10-Q 0001628280-26-052535 (2026-06-30) Note 20 open source ↗
- C One-line verdict Research interpretation or verification method, not company guidance.
- Follow segment notes in Microsoft, Alphabet and Amazon periodic filings to determine whether AI revenue, operating profit, depreciation and capital expenditure can be matched on the same perimeter. The next checkpoint is Microsoft’s FY2027 first-quarter filing and its new segment definitions. An AI segment or finer revenue disclosure could narrow estimates, but revenue alone would not establish return on invested capital; comparable cost, asset and cash-flow data would still be needed. C
- SpaceX and Cursor completed their merger on 2026-08-14 at an implied equity value of $60 billion. Subsequent filings should be checked for separate disclosure of application and AI revenue, costs and profit. Even if a new segment is disclosed, it should not be described as the market’s first verifiable sample of application revenue. C
Sources · 2
- C Watch · how to know this is wrong 1 Research interpretation or verification method, not company guidance.
- C Watch · how to know this is wrong 2 Research interpretation or verification method, not company guidance.
Inclusion and other relevant entities
Inclusion: Includes selected software/data companies with publicly described AI products or activities, from large platforms to smaller AI names. It is not the full application universe; exclusion does not imply an absence of US-listed shares.
Other relevant entities (outside this link’s bars): SAP · XETRA/NYSE ADR; Shopify · TSX/Nasdaq (both omitted from this sample, not unavailable in US public markets)
How much weight this map can bear
- Target close date 2026-10-23; actual trading dates are labelled per seat. Nasdaq market caps are snapshots without effective dates; ET is an estimate with a dated unit count. Basis: Nasdaq previous close × inferred quote-equivalent shares (MarketCap ÷ lastSalePrice); date derived from the source quote; ET moved to TXSE: estimated common equity = verified close × latest SEC common units; see detail for the unit-count date; retrieval status 169/179.
- Company-to-company network: compiled from filings and announcements up to the source-note cutoff 2026-10-23, built 2026-09-03, revised 2026-10-28; updated by hand, not daily.
- Narrative sources as of 2026-10-23, revised 2026-10-23. Facts retain their reporting periods. Market caps use the quote snapshot; company financial cards have a separately labelled filing-fetch date.
- Filed data uses SEC XBRL companyfacts, supplemented by official Inline XBRL filings explicitly listed in the sources. TTM first sums four consecutive quarters; where individual quarters are unavailable, prior fiscal year plus current YTD minus prior-year YTD is used only with matching currency, concepts and contiguous periods. Annual and cumulative values may be differenced on the same basis. Foreign filers may have annual data only: use the actual period on the card. A newer release cited in the narrative does not automatically update the card. Multiples are withheld for non-USD or mismatched entity scope; enterprise value is withheld when debt components are incomplete.
- Node size = company market cap ÷ sum of market caps of all nodes in its link (a market-cap proxy, not market share).
- Multi-link entities enter each link at full market cap. Link weights use the de-duplicated chain total, so the 18 weights can sum to more than 100%. These sample valuation weights are neither business shares nor bounds on industry concentration.
- Above $10B: large/mega-cap short-side hedge research group. This is not a short signal and does not imply a risk-neutral combination with mid caps.
- Relationship amounts: the dataset’s
vfield is in billions of USD; capacity goes ingw/mw;pctis a share whose meaning follows the edge kind: share of revenue on customer edges, equity stake on capital edges, share of output or capacity on offtake / supply / PPA edges; an emptyvmeans no standardized USD amount is available; disclosed original-currency amounts are shown separately without automatic conversion. Valuations of unlisted entities (Anthropic’s Series H post-money of $965bn, for instance) are self-announced single-round post-money or deal-implied figures, not comparable to a listed market cap, and enter none of this map’s weights. - Link tiers are research classifications based on disclosed orders, lead times and expansion plans: how long constraints may last and whether additional capacity can ease them. Tier 1: harder to ease in the near term; tier 2: expansion may help over time; tier 3: announced capacity milestones can be tracked. Plans are not guarantees, and an untiered link is not necessarily unconstrained.
- Counterparty classes: off-map entities are split by listing status into 184 genuinely unlisted, 160 listed but outside the 18 links, 38 subsidiaries of listed companies, 32 public bodies or sovereign funds, and 84 acquired; financial investors are kept separate and never enter the bars.
- Relationship counts use the dataset’s binding category for disclosed ties: signed contracts, completed transactions and existing customer or supplier relationships reported in filings, such as annual customer revenue shares. This is not a count of inspectable executed legal contracts. LOIs, frameworks, reservations, demonstrations, pending and unverified ties are excluded. Signed does not mean delivered or non-cancellable. Undisclosed identities remain anonymous; insufficiently sourced inferences are not treated as verified.
A/B/C identify source types, not a pass from independent verification of every relationship in this review. The 722 A-grade entries cite SEC or exchange filings; 83 carry accession numbers and 627 provide clickable URLs. An identifier or link does not establish that the document supports every paraphrased claim. The 291 B-grade entries cite company announcements, IR, websites or press; of 42 C-grade entries, 38 are structural inferences without independent primary sources and the rest third-party accounts. Missing links or weak support require further verification; grades do not upgrade relationship status. Narrative points have their own count and source grades.
- Seats: US-listed (ADRs included) with a filed business line or a filed contract in that link; each layer's specific test sits in its inclusion rule, and sampled layers claim representativeness only, never completeness.
- Cross-links: a company with filed lines in several links holds one seat in each, counted at full market cap every time (Rule 2).
- Edges connect at least one current or historical member of the 18-link sample and refer to a publicly checkable event. Acquired and delisted entities retain historical relationships but leave market-cap weights. Industry-knowledge inferences are graded C and explicitly lack independent sources.
- Coverage remains partial for IC substrates and ABF, PCBs, passives, silicon wafers, grid storage, data-hall construction and EPC, and T&D utilities. Qnity is included in the semiconductor-materials sample. Selected overseas substrate and PCB suppliers appear as counterparties; this is not comprehensive sector coverage.
- Market-cap weights cover the US-listed sample. Non-US entities may appear as counterparties in the network without entering the bars. Most ADR values cover the issuer rather than the US-tradable float. RIO is an exception: the quoted cap covers plc while financials cover the combined group, so valuation multiples are withheld. Each layer lists major omitted entities in its inclusion rule.
- Sampled layers: Mining & Commodities, Energy & Fuel, Materials & Industrial Gases, Applications & Data. These links have open boundaries; their members are a representative sample rather than the full set, and CR3 and total cap describe the sample only.
- Prices and market caps may update at different times, and relationships and business structures also change. Seats whose historical close cannot be verified keep a previous value with a date-mismatch label. That value is not necessarily from the preceding trading day; check the seat’s actual date.
- Not personalised: this page is public research material, takes no particular investor's circumstances into account, and is not investment advice, an offer or a solicitation.
- No licence: we hold no investment-adviser registration in any jurisdiction and do not provide personalised advice.
- Data timing: closes have trading dates; the market-cap endpoint supplies a retrieval date but no effective date. Financial filings, relationships and narrative each have their own periods and update dates; they are not a synchronized snapshot.
- Third-party rights: company names and tickers belong to their owners and are used only to identify them; source links point to SEC EDGAR and the companies' own public pages.
Prepared by the TopX team from public information. The source notes describe this update’s scope and dates; source grades do not certify independent review of every item.
Interest statement. 1) Positions: positions held by the people who compile and review this page, or their affiliates, in entities on the map are not disclosed one by one; readers should assume such positions exist and may run with or against the views here. 2) Business relationships: this site sells paid research reports on some entities on the map, identified by the paid-report links on this page; it has no employment, advisory or paid-promotion relationship with any entity on the map. 3) Other businesses: this site also operates EA sales and an AI API service; the instruments traded by the EAs may include entities on the map. 4) Revenue: this site earns from report sales, EA sales and AI API fees; this page is free and no entity has paid for it.
This page keeps no historical snapshots. When citing, include the version string "atlas 2026-10-23 · structure 2026-10-23 · graph 2026-10-23.1 · text 2026-10-23" and the section anchor (anchors are fixed by layer number, e.g. #sec-n10, and do not shift when layers are added or removed), and record the price close date and market-cap retrieval date separately. The source does not provide a market-cap effective date; the citation date is not a substitute for either data date.
| Link | Name | Class | Tier | Mid-cap long watchlist | total cap | CR3 | all seats | total cap | CR3 | Multi-link share | Top three |
|---|---|---|---|---|---|---|---|---|---|---|---|
| -2 | sampled | Upstream inputs | — | 2 | $14.75B | 100.0% (only 2) | 10 | $698.5B | 65.7% | — | CLF · MP |
| -1 | sampled | Upstream inputs | — | 1 | $3.643B | 100.0% (only 1) | 12 | $528.9B | 44.1% | — | UEC |
| 0 | sampled | Upstream inputs | — | 3 | $12.39B | 100.0% (only 3) | 10 | $473.3B | 81.1% | — | CE · CBT · ASH |
| 1 | Open link | — | 1 | $9.29B | 100.0% (only 1) | 4 | $402.7B | 97.7% | — | RMBS | |
| 2 | Open link | — | 0 | — | — | 11 | $20.46T | 63.0% | 94.8% | — | |
| 3 | Open link | — | 0 | — | — | 5 | $2.714T | 98.4% | 96.6% | — | |
| 4 | Chokepoint | Tier 2 | 1 | $9.764B | 100.0% (only 1) | 4 | $2.718T | 99.6% | 96.5% | AMKR | |
| 5 | Chokepoint | Tier 1 | 0 | — | — | 7 | $2.528T | 85.9% | — | — | |
| 6 | Chokepoint | Tier 2 | 8 | $52.33B | 54.1% | 22 | $1.582T | 75.4% | — | NVMI · ONTO · AEIS | |
| 7 | Open link | — | 2 | $11.56B | 100.0% (only 2) | 9 | $485.6B | 81.1% | — | SANM · PENG | |
| 8 | Chokepoint | Tier 3 | 2 | $9.147B | 100.0% (only 2) | 19 | $8.073T | 87.2% | 84.5% | AAOI · AXTI | |
| 9 | Open link | — | 6 | $41.3B | 58.4% | 18 | $711.6B | 46.4% | 24.1% | LFUS · VICR · MOD | |
| 10 | Chokepoint | Tier 1 | 1 | $5.499B | 100.0% (only 1) | 8 | $551.9B | 79.7% | 70.4% | POWL | |
| 11 | Chokepoint | Tier 1 | 1 | $4.902B | 100.0% (only 1) | 13 | $1.024T | 68.8% | 21.2% | OKLO | |
| 12 | Chokepoint | Tier 1 | 7 | $36.98B | 51.2% | 15 | $332.9B | 73.9% | — | HUT · GLXY · WULF | |
| 13 | Open link | — | 0 | — | — | 11 | $13.32T | 78.7% | 93.8% | — | |
| 14 | Open link | — | 0 | — | — | 5 | $7.83T | 96.6% | 96.6% | — | |
| 15 | sampled | Open link | — | 0 | — | — | 13 | $5.362T | 86.4% | 72.6% | — |
“Multi-link share” sums the sample market-cap weights of multi-link companies; CR3 sums the top three in the selected sample. Neither measures business market share or bounds industry concentration. The mid-cap watchlist includes seats above $3B and at or below $10B. Large and mega caps form the short-side hedging research watchlist; small and micro caps are reviewed separately for higher risk. These site-defined groups are not trade recommendations or evidence that a hedge works.
This map is free. Market caps are snapshots with the retrieval dates shown on this page. Behind each block sits one company's full set of books: segment definitions, contract terms, and the line that quietly went missing from disclosure. Several of these we read filing by filing and wrote up as deep-dive research reports. Those are the paid product.